The Schedule shows every active job in a business unit as a card with its equipment health. Open a job to see its monthly equipment plan, a live schedule of every unit on it, and, if your account has them, its materials.
The Schedule answers one question for each job: does it have the equipment it needs, today and in the coming months? A project manager or a superintendent often keeps that answer in a spreadsheet or in their head.
Gearflow already holds the job's equipment requests, the unit that fills each one, the dates, the moves and the repairs. The Schedule reads all of them and shows which jobs have a problem, then which unit on the job causes it.
Open it from Schedule in the menu. Every account has it, and every person can open it. You see only the business units and jobs that your access lets you see.
The overview shows one card for each active job in one business unit.
The page title is the name of the business unit. Under it, a line shows how many active jobs it has, and how many of them are at risk.
Gearflow remembers the business unit and department that you looked at last. When you come back to the Schedule, it opens on them.
Each card shows:
Click a card to open the job.
The cards are in bands, and each band has a heading and a count:
Inside a band, the cards sort by job name.
Each equipment request on a job has one state today. The Schedule uses the same words on the cards, the filters and the badges.
| Unfulfilled | The request has no unit assigned. |
|---|---|
| Disrupted | The unit is down for a machine-down repair while it should be on the job. |
| At risk | A unit is assigned, but its start date is in the past and it is not on site. |
| Overrun | The unit is on site after its planned end date. |
| On plan | The unit is on site, or it is assigned and starts today or later. |
| Called off | The rental is called off. |
The health pill rolls the states of a job up into one word:
An Unfulfilled request that starts next month does not make the job Critical. It is planning, not a problem yet.
A job's page shows the job name, the job code, the location and the months the job covers. The health pill is at the top right. Hover over it to see which equipment is off track. The arrow at the top left goes back to the overview, on the same business unit.
The tabs are Plan and Live schedule, and Materials if your account has it. The page opens on Live schedule when a request on the job has started, and on Plan when nothing has started yet.
The Plan tab shows the job's equipment demand month by month. Gearflow makes it from the job's equipment requests. There is no separate plan to keep up to date.
The Live schedule shows every equipment request on the job on a timeline. Each request is one row, grouped by equipment family. When one unit fills more than one request, its rows are next to each other.
Filters — they apply to the timeline and to the table:
Underutilized shows the units on site that ran less than 30% of an 8-hour day, on average, in the last 7 or 14 days. Pick the window when this filter is on. A unit with no telematics in the window is not on this list, because Gearflow does not know whether it sat idle. The page says how many units it could not judge.
The timeline:
Schedule or Table — the Table view shows one row for each equipment family, with Requested, Active, Deviation, Needed and Statuses. Active means on site, including overrun units.
The family drawer — click a family's name (or its row in the Table view) to open its drawer. It shows how many of its units are active, and a card for each unit with its status and its timeline. A unit with telematics also shows its days on rent and its utilization. The drawer has its own filter: All, Unfulfilled, Disrupted and Overrun.
The Materials tab shows each construction material that the job requested, and what is left to order. Your Gearflow contact turns on Materials for your account. Without it, the job page has no Materials tab.
Open Schedule. Pick the business unit. Read the Critical band first, then At risk. The red counts on each card tell you why.
On the job's page, open Plan. Read the current month first. A "short" number means the job has fewer units on site than it needs. A "projected" number in a future month is a gap you can still fix.
Open Live schedule. Click the state that the card showed, for example Unfulfilled. The timeline now shows only those requests. Click a bar to open the request and act on it.
Set Ownership to Rental and click Underutilized. The list shows the rentals that ran less than 30% of a working day in the last week.